Day

May 23, 2011

Results of the SMSP / POSCO partnership in 2010

The implementation of the double shift has allowed NMC to reach the objective of production, that is 1.763.986 tonnes of saprolite ore, with the creation of 118 additional jobs in mining sites. The volume of nickel metal contained in ferronickel produced by SNNC in 2010 is 20.512 tonnes with sales to POSCO reaching 21.388 tonnes.