Following the Line 1 furnace heat up during February 2013, the first metal bath tapping is expected to take place by the end of March, in line with the commissioning and ramp up plans. The plant is well positioned to deliver the two-year production ramp up to achieve its nameplate 60,000 tonnes of nickel in ferronickel per annum run rate by the end of 2014.